A rocket can get a satellite into space. The satellite still has to get to the orbit where it will do its job. GalaxEye is buying the hardware for that second leg from another Bengaluru company, Bellatrix Aerospace.
The multi-year agreement announced on 24 November covers Arka electric propulsion systems for 30 planned Drishti Gen-II Earth-observation satellites. Bellatrix will design, build, test and deliver the systems in phases. GalaxEye co-founder Pranit Mehta said deliveries would start with systems for two satellites. The companies did not disclose the contract value.
What a satellite engine does after launch
Once the launch vehicle releases a satellite, its onboard thruster can help move it to its working orbit. Later, the spacecraft can make adjustments to maintain its orbit or coordinate its spacing with the rest of the fleet. Arka is an electric thruster: it uses electricity to accelerate propellant. That produces a smaller push than a typical chemical thruster but uses propellant more efficiently, which can suit gradual manoeuvres.
GalaxEye wants to combine optical imagery and radar on the same spacecraft. Optical images capture familiar visual detail when the view is clear. Radar can collect information at night and through clouds. A fleet gives the operator more chances to revisit the same location. For someone monitoring a flooded area, the time until the next usable image can matter as much as how sharp it is.
Why the first two systems matter
ISRO confirmed that Bellatrix completed an Arka200 experiment on its POEM-3 orbital platform in January 2024. That gave the company experience with its electric propulsion technology in orbit. The new order tests a different capability: supplying systems that can be integrated, tested and delivered repeatedly as GalaxEye builds more spacecraft.
The thruster is only one part of a satellite, but integrating it requires both companies to coordinate on matters such as electrical power and the spacecraft’s control system. A phased order gives them a chance to learn from the first integrations before producing the rest. It also gives Bellatrix a customer programme around which to plan production, without establishing how much revenue it will earn or when.
What to watch as the fleet takes shape
Look for delivery and integration of the first two systems, then for an in-orbit demonstration on the new spacecraft. Those milestones will tell readers more about the progress of the Bengaluru supply chain than the order size alone. The 30 satellites are the scope of the announced agreement, not a count of equipment delivered or spacecraft already in orbit.






Leave your thoughts